We just upgraded to Scrumworks 4.3.0 and now when I launch the Pro Desktop Client, Scrumworks will automatically load the project that I was most recently working on. Furthermore, if I left a sprint open then Scrumworks will take the time to automatically load that sprint. I am involved with 5 different projects and I really liked being able to choose which project to load before having to wait for it.
Is there an option somewhere to control this behavior?
Help get this topic noticed by sharing it on
Twitter,
Facebook, or email.
Twitter,
Facebook, or email.
Add an option to prevent Scrumworks from automatically loading a project
-
Hi ecrofts,
The only way I know to turn this off is to close out of the project before you exit ScrumWorks. It should be saving the layout of the screen as you shut it down, and restore it when you bring the desktop client back up. -
-
Yes, I've discovered this workaround and this is what I do. However, it counteracts the wonderful feature that was introduced a few revisions ago that would remember the configuration that I had for each project. If I have to close each project before closing scrumworks then it will never remember my configurations.
I'd really appreciate an option to control this in your next revision. -
-
I have changed this topic to an idea. Can you provide any more details. Would we want the option on each product by product to automatically load for example?
-
-
I would think it would be more appropriate as a user setting. For example, although I am involved in several different products and would like the option to choose which one is loaded, most of the developers are involved in only one product and so would probably like to automatically load either the last viewed product or a specified product. Having it set by product would not be sufficient for this case (though it would be better than not getting to choose at all =P).
-
-
And while I have your ear about this kind of issue, it would be great if the "show estimate history" checkbox on the sprint detail would remember its state.
-
-
This community page always has the ear of the Product Owner, development team, and support. Everyone reads it. If you can though, it would be a good idea to make a new Idea Topic for the show estimate history persistence. I believe that would be another Backlog Item, and the 'me toos' work better when each item is broken down as far as possible.
-